An industrial mezzanine is a handy solution to optimise the interior and exterior spaces of warehouses, avoiding pricey structural expansion measures. However, to ensure safety and efficiency, the project must follow a well-designed process, subdivided into three main stages.

1. Primary analysis

In the first stage, it is evaluated the space where the mezzanine will be installed, taking into consideration several technical key aspects:

  • Flooring: it must be able to support the weight of the structure and the expected load.
  • Mezzanizable surface: it is necessary to assess the volume of the mezzaninable surface.
  • Seismic risk: the solution must be designed based on the seismic risk index in the installation area.

This phase is crucial because it determines the project’s practicability and identifies any technical limitations.

2. Customisation based on needs

Once acknowledged the possibility of installing the mezzanine, we move to the customisation stage, where it is adapted to specific operational needs:

  • Intended use: the mezzanine can be used as a warehouse, an office, technical areas, or for external use, with different configurations based on its purpose.
  • Load characteristics: it is fundamental to rate the weight, size, and handling of goods to choose suited materials and load capacity.
  • Accessibility and safety: stairs, railings, loading gates, and anti-fall systems must ensure workers protection.
  • Environmentally friendly: the structure must be compatible with existing systems, escape routes, and safety rules.

This phase guarantees that the mezzanine meets regulatory requirements while also being optimised for business operations.

3. Ensure compliance and authorisations

Before proceeding with the installation, it is essential to ensure that the project complies with current regulations regarding safety and production, which may include structural load, fire prevention, and specific requirements for industrial or commercial use.

Depending on the context and the final use, authorisations or notifications to relevant authorities may be required. It is also essential to conduct preliminary verification to prevent potential problems during production.

Once the project’s compliance has been confirmed, the mezzanine can be installed by relying on specialised professionals, ensuring a safe and efficient outcome.

Conclusions

Designing an industrial mezzanine requires evaluating available space, tailoring it to operational requirements, and meeting existing regulations. By following this structured approach, businesses can implement a solution that is both efficient and safe while improving overall facility management.

Relying upon sector specialists guarantees a strategic investment that streamlines operations without requiring extensive structural modifications.

 

For further information, visit our website or follow us on our social media: we are on InstagramFacebook e LinkedIn.